Our Projects
East Gosford Unit – Modification & Safety Upgrade
Works included supply and installation of grab rails and hand-held shower to support mobility as per OT report, along with replacement of a waterproof double GPO in the bathroom. Hallway walls were patched, blocked with timber for rail support, and repainted using a full 3-coat system. Similar blocking, patching, and painting were carried out in the separate toilet area to support angled grab rail installation. In Bedroom 1, advanced biological cleaning was performed due to severe urine contamination, followed by full replacement of subfloor sheeting and installation of compliant vinyl flooring. New vinyl floors were also installed in Bedroom 2, Hall, Lounge, and Dining areas after carpet removal and subfloor works where required. All flooring meets AMS specifications including R9 slip resistance, sound reduction, and fire rating.
