Our Projects
Airds House – Complete Bathroom and Mobility Access Improvements
This project involved a complete bathroom upgrade, and accessible external path works to support safe, independent living. The bathroom was fully renovated with new non-slip floor and wall tiles, waterproofing, updated plumbing and electrical, new toilet, vanity, and a walk-in shower with handheld hose, grab rails, curtain, and drainage. Accessibility features include a widened cavity sliding door, lowered basin, support rails, and a new exhaust fan for ventilation. Externally, a compliant wheelchair ramp with safety rails was constructed, and temporary accessible amenities were provided during works to ensure minimal disruption.
Garden Bed & Civil Upgrade Works
Full external upgrade including 412m² soil excavation, 132m³ compliant waste disposal, and reinforced concrete kerbing (40m). Works included galvanized mesh installation, 140m² DDA-compliant concrete paths, DECO granite finish (223m²), and Straight curve™ steel garden edging.
Additional scope: asbestos pit removal with air monitoring, comms pit relocation, tree removal, and 84x native plantings. Installed outdoor furniture, signage, and safety elements.
All works delivered under strict WHS protocols with full environmental and compliance documentation. Safe, seamless, and site ready.
Landscape & External Upgrade
ATIZ Group was engaged by Bridge Housing to deliver a comprehensive landscape and external upgrade at 2 Victoria Road, Glebe. The project improved safety, accessibility, and amenity across this multi-unit complex through stormwater and sewer upgrades, concrete replacement, new fencing and balustrades, retaining wall works, and extensive landscaping. Communal facilities such as clotheslines and carparking were also upgraded. All works met current BCA, NCC, and Australian Standards. Delivered on time and on budget, the project enhanced functionality, reduced maintenance risks, and created greener, more liveable outdoor spaces for tenants.